Racine, WI

Serving Racine

Racine epoxy floors for kitchens heading into city plan review, salted garages, damp basements and busy plant floors.

Kenosha Epoxy Flooring brings more than 20 years of experience to epoxy-flooring in Racine, where a commercial kitchen floor carries a step that a garage floor does not. Before a restaurant, bakery or tavern kitchen is resurfaced, someone has to know which office sees the plan and when. That question has a specific answer in this city, and it often shapes the schedule more than the coating does.

We build every floor on a mechanically opened slab. A diamond grinder or a shot blaster cuts the profile, we never acid etch, and the proposal names the product, the system build and the finished thickness so the floor that goes down can be checked against the quote. That written specification matters even more when a reviewer will compare the installed floor to an approved plan.

Below we walk through how kitchen floor work moves through city review, what the floor line on a finish schedule has to say, and how we handle the garages, basements and plant floors that make up the rest of the work here. Where the answer depends on an inspector or a reviewer, we say so and leave the call to them.

Kitchen Floors in Racine Go Through the City’s Own Health Department

A smooth light-colored coved kitchen floor in a Racine restaurant, mopped down and ready for the health inspector.

The City Reviews It, Not the County

A restaurant, bakery or tavern kitchen inside the city limits is inspected by the City of Racine Public Health Department, which covers restaurants, taverns, caterers, hotels, motels and public pools in the city as an agent of the State of Wisconsin. Its Environmental Health Division works out of City Hall at 730 Washington Avenue. Owners who expect a county office to handle the kitchen lose time finding out otherwise.

The city runs its own plan review for food service establishments, with Public Health, Fire and Building each reading the submission. The Building Department is in-house as well, so everyone looking at a kitchen plan is city staff. We send clients to those offices with a clear floor specification rather than guessing at what a reviewer will want.

What Puts a Floor Into Plan Review

The city packet lists the occasions that call for a plan: new construction, conversion of an existing structure, remodeling, a change in license type, or a change in the food served. A floor recoat is not named on that list by itself. Remodeling is the nearest trigger, so whether a particular floor job counts is a question for Environmental Health at 262-636-9203 before anything goes on the calendar.

We ask that question early because the answer changes the whole sequence. A kitchen that is also changing its menu or license is already headed into review, and the floor belongs in that same submission. A straight recoat of an existing floor may be treated differently, but that is the department’s decision, not ours.

Approval Comes Before the First Pass of the Grinder

The packet is blunt: the plan must be submitted, reviewed, and approved prior to beginning any work. We read that to include tearing out the old floor, so we do not grind, patch or prime a kitchen slab that is still waiting on a decision. The city asks applicants to allow thirty days for review once the application and fees are in.

Thirty days is a planning number we build around. If an owner wants to reopen on a set date, we work backward from it, leave room for the review, and then hold a production window that fits the cure time of the chosen system. Overnight and weekend windows are available when the kitchen has to keep serving through the rest of a remodel.

Looking for epoxy-flooring closer to Union Grove? See Epoxy-Flooring in Union Grove.

What the Finish Schedule Has to Say About the Floor

Smooth, Light in Color and Easily Cleanable

The city’s plan review checklist asks every applicant to address surface finish specifications for floors, walls, ceiling and work surfaces, and it sets the standard as smooth, light color and easily cleanable. The floor entry on the finish schedule is where that standard gets answered. A vague line such as “epoxy floor” tells a reviewer very little about texture or color.

We write the floor entry the way our proposals already read: primer, body coat, any broadcast, topcoat and finished thickness. For a kitchen that usually means a 100% solids epoxy or a urethane cement system in a pale tone, with a topcoat chosen for the cleaning chemicals the crew actually uses. Specifics give a reviewer something concrete to approve.

Why Color and Flake Are Not Only a Taste Question

A dark floor or a dense vinyl flake broadcast can look sharp in a showroom and still sit poorly against a requirement for a light, easily cleanable surface. Because the checklist puts color and cleanability in the same line, we treat them as a compliance choice first. Owners still choose, but they choose from systems that fit the written standard.

Slip resistance pulls the other way, since a wet kitchen floor needs some texture underfoot. A fine quartz aggregate broadcast locked under a topcoat can add grip without leaving deep pockets that hold grease. We match the grit to the cleaning routine so the floor stays smooth enough to clean and rough enough to stand on.

The Cove Where Floor Meets Wall

The Wisconsin Food Code is built on the 2013 FDA Model Food Code, and its section 6-201.13 calls for floor and wall junctures to be coved, enclosed or sealed. A resinous floor can run up the wall as an integral cove base, which removes the seam where water and debris collect. That cove detail belongs on the plan rather than being decided on site.

We draw the cove height and radius into the scope and carry the same system up the wall, so the base is one piece with the floor. Around drains, equipment legs and door thresholds we detail the terminations the same way. Since the installation must match the approved plan, what we draw is what we install.

Cleaning Methods and the Floor Sink

The same checklist asks for floor cleaning methods and a floor/utility cleaning sink. Those items affect the coating choice, because a floor washed with hot water and degreaser every night wears differently from one mopped once a day. We ask how the crew cleans before we recommend a topcoat.

The utility sink and any floor drains also set where the slab’s pitch has to be preserved and where the coating must be tied off cleanly. We keep drain bodies clear and detail the edges so water runs where the plumbing expects it. That way the floor, the cleaning method and the sink on the plan describe one working system.

Garage and Basement Floors in Racine Homes

Garages and basements make up the residential side of the work in the city. The census counts 17,476 owner-occupied detached houses in Racine, and many of them have a slab that has been patched, painted or left bare for years.

Testing Before Anything Is Applied

Moisture testing is a line item in every residential scope we write, for a basement slab and a garage slab alike. Depending on the floor we use an ASTM F2170 in-situ relative humidity probe, an ASTM F1869 calcium chloride test, or an ASTM D4263 plastic sheet check as a first read. A dry-looking slab is not proof of a dry one.

Basements add hydrostatic pressure, efflorescence and sump pit detailing to the picture. Where readings call for it we specify a moisture-mitigation primer, and we name moisture first when we read the warranty exclusions aloud before the job is sold. If cracks or failed coatings mean a slab needs repair or replacement, we say so before quoting a coating.

Salt, Brine and Hot Tires

Racine sits on Lake Michigan, and winter here tracks road salt and calcium chloride brine onto garage floors on every set of tires. We build garage systems for that, typically an epoxy base with a polyaspartic or polyurea topcoat that resists hot tire pickup and holds up to the brine. A coating still follows the slab under it, so it will not stop a moving crack.

Curing on the Slab’s Schedule

We schedule curing against slab temperature and the dew point spread at the slab surface, not the calendar. An unheated detached garage in a cold month may simply have to wait for spring, and we say so rather than risk amine blush or a soft cure. Every home job also gets a written contract before any deposit, under Wisconsin’s ATCP 110 rule, with the products and warranty written in.

Wisconsin issues no state license for floor coating, so we check with the City of Racine Building Department whether a given job needs a permit before it is scheduled. A job that includes pouring a new slab raises different questions than a recoat does. The inspector’s answer decides it, not our assumption.

Shop and Plant Floors in the City

Industrial Floors on State Street

Racine has a manufacturing base, and the CNH Industrial plant at 700 State Street is one of the addresses that shows it. Plant, warehouse and shop floors in the city take forklift traffic, dropped parts, oil and cleaning chemicals, and they rarely get a quiet week to be resurfaced. Those conditions decide the system long before color comes up.

For heavy traffic we usually look at a thicker 100% solids epoxy build, or urethane cement where heat, chemicals or thermal shock are part of the day. Shot blasting opens large areas quickly to the ICRI CSP profile the system calls for. Where a building only needs a hard, dust-free surface, a lithium silicate densifier on ground concrete can be the honest recommendation.

Joints and Forklift Wheels

Saw-cut control joints are where industrial coatings usually fail first, because forklift wheels chip the unsupported edges. We fill those joints with a semirigid filler before any coating goes over them, so the edge has something solid behind it. Where a joint is still moving, we tell the owner plainly that a coating will not hold it still.

Areas with electronics or sensitive assembly sometimes need static-dissipative or ESD flooring, which is specified to a resistance range rather than a look. We confirm the range the plant requires before quoting. Grinding dust and slurry are collected on site and kept out of street drains and away from the lake.

Working Around Production Hours

Plants and shops seldom can stop for a coating crew. We phase large floors in sections and schedule overnight and weekend windows so production keeps moving around the work. Faster-curing topcoats help shorten the return to service, but we still set the timing by slab temperature and dew point rather than a promised hour.

Before any industrial job we walk the floor, read the joints, cracks and old coating, and put the product, build and finished thickness in writing. That gives a plant manager a document to hold the finished floor against. It is the same discipline we bring to a kitchen plan sitting in front of a city reviewer.

  • 20+ Years on Concrete
  • Moisture Tested First
  • Written System Proposals

What we do

Services Available in Racine

A ribbon of gray epoxy base coat poured onto a ground garage slab in a Kenosha split-level, ready to be spread.

Epoxy Garage Floor

Ground, moisture-tested epoxy garage floors built to handle Kenosha road salt, brine and hot tires, with the full system named in writing.

Learn more
A final buff on a polished concrete floor in a new Kenosha office and lab building.

Polished Concrete Floors

Polished concrete for Kenosha warehouses, showrooms and homes, ground in stages and densified for a hard, low-maintenance floor.

Learn more
A rolling tool chest wheeled back onto a same-day polyaspartic garage floor in a Kenosha subdivision.

Polyaspartic Floor Coating

Fast-curing polyaspartic floor coatings for Kenosha garages and commercial floors, resistant to UV ambering, salt and hot tire pickup.

Learn more
A coated basement floor in a Kenosha bungalow, the coating carried neatly around the steel support column.

Basement Floor Epoxy

Basement floor epoxy for Kenosha homes, built on a moisture-tested, ground slab with drains, sump pits and wall edges detailed properly.

Learn more
Metallic epoxy pushed across the floor of a downtown Kenosha storefront, pearl and bronze pigment swirling as it spreads.

Metallic Epoxy Floor

Marbled metallic epoxy floors for Kenosha homes, showrooms and commercial spaces, built on a flat, ground and moisture-tested slab.

Learn more
A cured crack repair ground flush on an old Kenosha garage slab before coating.

Concrete Floor Repair

Crack, spall, joint and scaling repair for Kenosha concrete floors, with an honest call on when a slab needs replacing instead.

Learn more
A loaded cart rolled across a new coated assembly floor in a Kenosha industrial building.

Commercial Epoxy Flooring

Commercial epoxy floors for Kenosha warehouses, plants, shops and service bays, with joints filled first and work scheduled around operations.

Learn more
A full-broadcast flake floor inspected at its working edge in a Kenosha ranch garage.

Flake Epoxy Floor

Full-broadcast vinyl flake epoxy floors for Kenosha garages, basements and shops, sealed under a clear topcoat that handles salt and hot tires.

Learn more
A walk-behind planetary grinder opening up an old sealed slab in a Kenosha industrial building, half the floor already ground.

Concrete Grinding

Diamond grinding and shot blasting for Kenosha concrete floors: coating and mastic removal, leveling and surface profiling before a new floor.

Learn more
A static-dissipative floor tested with a heavy cylindrical electrode in a Kenosha electronics assembly room.

ESD Flooring

Static-dissipative and conductive ESD epoxy floors for Kenosha electronics, lab and data spaces, grounded and tested after installation.

Learn more
A red quartz urethane cement floor with a coved base and trench drain in the dish area of a Kenosha restaurant kitchen.

Commercial Kitchen Flooring

Seamless urethane cement and resin floors for Kenosha restaurant and institutional kitchens, coved at the walls and built for hot washdown.

Learn more

Ready to Get Started?

Request a free quote today and we'll get back to you fast.